Our new home was modular in that it was built indoors over the winter and not subjected to rain or snow during the building process. The foundation was dug in March 2009 and delivery of the house was scheduled for April 7th.
Click the thumb nail picture for a larger image.
This is how the property looked when we decided to buy this 2.55 acre lot.
Unfortunately this is not a view from our property but just down the road from our place where you can see part of the large lake at Montsberg Conservation area.
House being delivered using 5 flatbed trucks with the 3 main modules, a roof piece and framing and trusses for the garage that was built on site.
The monster crane arrives that will lift the modules into place.
The first module being prepped for lift-off.
First module being lifted into place.
A view of the first module in place from the rear of the house.
Second module in place. You can see the fireplace and some siding and insulation that will be used to finish the exterior of the house. All the walls were fully finished, flooring in place and all wiring, plumbing installed ready to be hooked up in the basement.
Third module lift-off.
Positioning the last module.
Still delivery day (April 7th) and you can see the kitchen is largely finished and appliances ready to be installed.
End of delivery day.
Roof module in place.
Rear view of the house.
Basement enclosed (April 15th)
Garage being built.
Stonework being done on rear of the house.
Finished stonework (May 22nd)
All finished (June 21st).